British Transport Commission: British Waterways
>
North Western Division
>
Northern District
>
Leeds and Liverpool Canal
>
Culverts, drainage and sewers
BW177/6/10/8/7/8
"[Plan of] Gilstead/ Heaton main - survey of [Leeds and Liverpool] canal crossing Bradford Corporation Waterworks"
Site plan and plan showing line of proposed 30 inch diameter steel main diversion. By S. Asquith, Waterworks Engineer, Bradford. Stamped "British Waterways North Western Division, Approved Drawings, Divisional Engineer's Office. Signed I.M. Dal[ton] Date 12 Aug [19]63".
January 1962 - August 1963
BW177/6/10/8/7/8
1 Sheet