British Transport Commission: Docks and Inland Waterways Executive
>
South Eastern Division
>
Divisional Engineering Office, Watford
>
Dredging Records
BW175/4/7/2/5
Plans of the Birmingham and Fazeley Canal at Drayton Bassett
Includes a cross section showing water levels before and after dredging. Details include lenght dredged, dates commenced and completed, amount tipped on offside bank, and contractor details. Stamped "Docks and Inland Waterways Executive, South Eastern Division, Hartshill Depot, Nr. Nuneaton". Signed by E. Guyett. Four sheets.
1951
BW175/4/7/2/5
These records are available immediately for research
1 Roll