British Transport Commission: South Wales Docks: Civil Engineer's Office
>
Plans concerning Swansea Canal
>
Aqueducts and bridges
BW174/3/4/1
Plans showing repairs to aqueduct at 14 miles 40 1/2 chains on Swansea Canal
Includes: elevation of top end; elevation of bottom end; section at centre line. Marked in ink "British Transport Commission Civil Engineer South Wales Docks Swansea Canal Repairs to Aqueduct at 14M. 40 1/2 chains. Drawn J.S.J. Traced J.S.J. Date 19:6:56 Corres. Ref. DE.S. 800/4. Sheet 1 of 1. Drg. No. S.D.6165". Stamped "British Transport Commission Civil Engineer's Office South Wales Docks 29 June 1956 No SD6165 Ref DES. 800/4".
19 June 1956
BW174/3/4/1
These records are available immediately for research
1 sheet