BW167/6/6/1
Conversion of Second Floor for Use as a Museum at Stoke Bruerne
Roof and proposed ceiling detail; proposed hand railings in front of first and second floor canal frontage doors; cold water supply tank detail; trap door detail to be fitted in new ceiling. Created by the Chief Engineer's Department, Watford.
[1960s]
BW167/6/6/1
These records are available immediately for research
1 sheet