British Waterways Board
>
British Waterways Board: Northern Region
>
Weaver Navigation
>
Improvements and maintenance
BW167/25/27/6/1
[Engineering drawings for the] Replacement of Sutton Sluices. Suggested Sluice Gate Arrangement
Site plan; side elevation; upstream elevation; section; detail. With note that drawing was revised 20 June 1969. Created by British Waterways Board Chief Engineer's Department.
March-June 1969
BW167/25/27/6/1
These records are available immediately for research
1 sheet