British Waterways Board
>
British Waterways Board: Northern Region
>
Weaver Navigation
>
Swing bridge at Weston Point Docks
BW167/25/27/5/1
List of drawings with descriptions for the new swing bridge at Weston Point Docks
Lists R White & Sons as main contractor and Sefton Engineering as responsible for hydraulics.
[late 20th century] (c.1969)
BW167/25/27/5/1
These records are available immediately for research
2 sheets