British Waterways Board
>
Chief Engineer's Department, Watford
>
BWB engineering drawings
>
BWB engineering drawings nos 769-1004
BW167/6/7/1/65
"Brentford Depot renewal of concrete surfacing at Collier's Dock & No 3 warehouse"
Plans and section
mid 1960s
BW167/6/7/1/65
These records are available immediately for research
1 sheet