British Waterways Board
>
Chief Engineer's Department, Watford
>
BWB engineering drawings
>
BWB engineering drawings nos 769-1004
BW167/6/7/1/55
Weston Point Docks. New transit sheds and renewal of Church Cut swing bridge
Plans sections and elevations showing arrangement and construction of new sheds nos 5 and 7, proposed quay at Tollemache Dock for Maontague Meyer, section of dock wall on Mersey side and reconstruction of bridge bedstone and pivot assembly
1957-1965
BW167/6/7/1/55
These records are available immediately for research
16 sheets