Commissioners for the Improvement of the Navigation of the River Severn
>
Improvements and maintenance
>
Bridges
BW163/16/5/31
"Proposed Improvement of the Severn Navigation. Longitudinal Section of G.W.R. Gloucester-South Wales Line Reconstruction to Provide 40ft Clearance above Low Summer Level of the Navigation"
[Surveyed by H J Minett, Engineer and Manager to the Severn Commission].
[1940s]
BW163/16/5/31
2 documents